Transporter
GASTRANS d.o.o. Novi Sad
Narodnog fronta 12
21000 Novi Sad

Reference: Article 24.3.1.10 of the GASTRANS d.o.o. Novi Sad Natural Gas Transmission System Network Code (hereinafter NC)

There are no Interconnection Points at which none of Firm Capacity Products with a duration of one month or longer are not offered, except for Firm Yearly capacity, which is offered for contracting when firm long-term capacity from the Long-Term Gas Transportation Agreement (Long-Term GTA) becomes available for contracting on the basis of Surrender, cessation of the Long-Term GTA and in case from the Article 9.4 of NC.

GASTRANS d.o.o. Novi Sad