16.7.1. Maintenance Program

Maintenance of the GASTRANS Transmission System is carried out in accordance with the approved annual work plan. Repair operations on the GASTRANS Transmission System, limiting the volume of natural gas transportation, is not planned in 2024.

At the same time, from 4 to 11 June 2024, scheduled repair and renewal operations are planned for the offshore section of the Turkish Stream pipeline (operated by South Stream Transport B.V.), which will cause natural gas transportation through downstream gas transmission systems, including the GASTRANS Transmission System, to be suspended during this period.

Gastrans d.o.o Novi Sad